Menu

Energy Storage Busbar and Cable Links

For energy storage cable links built properly, IEW turns customer concepts into finished, tested assemblies. Renewable energy kit sits outdoors for years, often in remote spots, so cable builds need to last without constant attention. Storage cabinets need heavy section links between modules made to accurate lengths. IEW handles everything from fine ribbon cable to 180mm² power cable, so small signal leads and heavy power harnesses come from one supplier. Terminations are crimped or solder-tinned as required, with a large stock of crimps, connectors and soldered terminals on hand. Every cable is fully ATE tested before it leaves site, so it is right first time, every time. Work is carried out under ISO 9001:2015 and to IPC/WHMA-A-620, so build standards stay consistent batch after batch. A 3D CAD service is available to help develop the design before it goes into production. Need the full unit? IEW can supply turnkey builds, combining metalwork, cables, looms and PCBs into a complete assembly.
Talk to IEW about your requirements today.
ENQUIRY FORM

More Products

  • Cable Assembly & Harnesses - Converting customer concept into reality

  • Medical Device Cable Assemblies

  • Wiring Harnesses for Hospital Beds

  • Diagnostic Imaging Equipment Wiring Looms