Hydrogen Equipment Cable Assemblies
For hydrogen equipment cable assemblies built properly, IEW turns customer concepts into finished, tested assemblies. Renewable energy kit sits outdoors for years, often in remote spots, so cable builds need to last without constant attention. Electrolysers and fuel cell systems need control and power cabling built and tested to a high standard. The range runs from ribbon cable right up to 180mm² heavy section cable, covering simple leads through to complex multi-branch looms. IEW keeps a huge range of crimps, connectors and terminals, so termination matches the drawing rather than what happens to be on the shelf. All assemblies are checked on automatic test equipment (ATE), giving confidence the build matches the drawing. Work is carried out under ISO 9001:2015 and to IPC/WHMA-A-620, so build standards stay consistent batch after batch. Need the full unit? IEW can supply turnkey builds, combining metalwork, cables, looms and PCBs into a complete assembly. Fast turn prototypes and assemblies are available when time is tight.
Get in touch with IEW to discuss your next build.
Visit the Industrial Electronic Wiring Ltd website for more information on Hydrogen Equipment Cable Assemblies