The instrumentation will power the load cell. The mV/V signal coming back from the load cell is converted by the indicator and displays the force in a unit (e.g.: Kg, kN, Lb -customers choice). The indicator will need to be mounted in to a case or control rack for safe use.
The load cell and instrumentation will require calibrating together for the system to work correctly. This is done by applying a known force to the load cell and the instrument's gain to be set.
If you would prefer to discuss your application with an engineer whilst studying the website, please do not hesitate to contact us on +44 (0) 1926 864444
Visit the Procter & Chester Measurements Ltd website for more information on Load Cell Panel Mount Indicators